Code & Circuit Technologies
Code&CircuitTechnologies
Work with us

Solutions

Engineering that ships

R&D, connected devices and training for farms, schools and businesses across Kenya.

All services
  • Water-Quality MonitoringOxygen, temperature and turbidity alerts for fish farms.
  • Automated Fish FeedingScheduled feeders for Lake Victoria cage farms.
  • STEM WorkshopsHands-on sessions and teacher training for schools.
  • IoT DevelopmentFrom bench prototype to hardware that survives the field.
  • PortfolioSelected work from the field and the lab.

Field story

How a Kenyan fish farm uses IoT to automate its ponds

Read more

Learn

Learn by building

Workshops, events and open notes for students, makers and educators.

Browse workshops
  • WorkshopsPractical sessions in robotics, electronics and code.
  • EventsMeetups, hackathons and community sessions.
  • Weekly LearningsAn open archive of what we teach each week.
  • BlogAquaculture, IoT and STEM stories and guides.

Workshops

Bring a hands-on robotics session to your school

Read more

Community

Build with us

A community of engineers, students and makers working on open projects.

Meet the community
  • CommunityWhere to find us on GitHub, Discord and Telegram.
  • ProjectsOpen projects you can explore and contribute to.
  • RegisterSign up yourself or your group for a programme.

Community

Join engineers and makers building in the open

Read more

Company

Code & Circuit

A Kenyan technology company working at the meeting point of hardware and software.

About us
  • About UsOur mission, team and story.
  • CareersOpen roles and internships.
  • ContactTalk to us about a project or partnership.

Careers

Help us build technology that works for Africa

Read more
Menu
    • Water-Quality Monitoring
    • Automated Fish Feeding
    • STEM Workshops
    • IoT Development
    • Portfolio
    • Workshops
    • Events
    • Weekly Learnings
    • Blog
    • Community
    • Projects
    • Register
    • About Us
    • Careers
    • Contact
Work with us

Work with us

Have a project, a farm or a classroom in mind?

Tell us what you are working on and we will get back to you with how we can help.

Start a conversationBook a workshop
Code & Circuit Technologies
Code&CircuitTechnologies

Building tomorrow's technology through robotics and IoT innovation, and teaching the next generation of engineers to do the same.

  • hello@codencircuit.co.ke
  • +254 (792) 181-871
  • Kisumu, Kenya

Solutions

  • Water-Quality Monitoring
  • Automated Fish Feeding
  • STEM Workshops
  • IoT Development
  • Portfolio

Learn

  • Workshops
  • Events
  • Weekly Learnings
  • Blog

Community

  • Community
  • Projects
  • Register

Company

  • About Us
  • Careers
  • Contact

Get workshop dates and field notes

Occasional emails about new workshops, events and what we are building.

© 2026 Code And Circuit Technologies LTD. All rights reserved.

  • Privacy Policy
  • Terms of Service
  • Cookie Policy
Back to Articles
Iot

How We Scope a 2-Day Field Deployment

A field deployment that looks simple on paper can fall apart in the first hour if it wasn't scoped properly. Here's the process we actually use before committing a crew and hardware to a site.

RY
Rabin YitzahkCommunity Manager
September 15, 20267 min read
Field DeploymentProject ScopingIoTProgram ManagementKisumu
How We Scope a 2-Day Field Deployment

Partners often come to us needing a specific installation done in a fixed, short window: two days on-site, sometimes less, often at a location that's several hours from Kisumu. Getting a deployment like that right depends far more on what happens before the crew leaves the workshop than on anything that happens once they arrive. This is roughly the process we run.

Start with a real site survey, not a description of the site

A written description or even photos from a partner are a starting point, not a substitute for direct confirmation of the things that actually determine equipment choices: power availability and type at the site, connectivity (cellular signal strength, or whether LoRaWAN gateway coverage exists), physical mounting options and their condition, and site access (can a vehicle reach the exact point, or does equipment need to be carried the last stretch). Wherever a remote survey (a video call walkthrough with someone on-site, if a prior visit isn't practical) can substitute for our own visit, we use it, specifically to catch anything that would change our equipment list before we've already loaded the vehicle.

Build the equipment list against failure, not just against success

A field kit for a short deployment window should assume something won't go to plan, because on a fixed two-day schedule there's rarely room to make a second trip for a missing part. That means: spares for the components most likely to have a manufacturing defect or get damaged in transit, a broader toolkit than the specific job seems to require, because the actual site conditions sometimes differ from what the survey suggested, and enough contingency in the schedule itself (built into how the two days are planned, not just hoped for) to absorb a problem on day one without losing day two entirely.

Confirm the site-specific unknowns before departure, not on arrival

A short list of things we insist on confirming before a crew leaves, because discovering them on-site costs the most expensive kind of time: exact GPS coordinates or a clear physical description of the mounting location, who has authority to grant physical access on the day (a farm owner absent on the scheduled day is a solvable problem if known in advance, and a serious one if discovered on arrival), and any local permissions or notifications needed (a county office, a community leader, a landowner) so the crew isn't the first to raise them on-site.

Sequence the work so day one derisks day two

For a two-day window, we sequence deliberately: the highest-uncertainty task (the one most likely to reveal a problem, like a mounting surface that turns out to be different from what the survey suggested, or a connectivity reading that doesn't match expectations) happens as early as possible on day one, not late on day two when there's no time left to adapt. Day two is planned around confirming the installation is genuinely working under real conditions, not just physically mounted, and training whoever on-site will be the first point of contact for basic troubleshooting.

Leaving the site with a working handover, not just working hardware

A deployment isn't complete when the hardware is mounted and reporting data. It's complete when whoever is on-site day-to-day (a farm manager, a school's ICT teacher, a county officer) knows what normal looks like, knows the simplest thing to check if something seems wrong, and has a direct way to reach us if it's beyond that. We build this handover into the schedule explicitly, rather than treating it as something to fit in if time allows, because a deployment that works perfectly but leaves nobody on-site able to recognise a problem early tends to generate the most expensive kind of maintenance callout later: the one that could have been caught on day one of the fault, not week three.

If you're planning a field deployment and want help scoping it properly before committing a crew and budget, get in touch. You can also see how we take hardware from prototype to the field.

Have hardware that needs to work in the field?

From bench prototype to a field-durable product: IoT and embedded development, R&D and technology advice for teams deploying hardware in Kenya.

About iot product development Start a conversation

In This Article

  • Start with a real site survey, not a description of the site
  • Build the equipment list against failure, not just against success
  • Confirm the site-specific unknowns before departure, not on arrival
  • Sequence the work so day one derisks day two
  • Leaving the site with a working handover, not just working hardware

About the Author

RY

Rabin Yitzahk

Community Manager

Passionate about tech education and building inclusive communities in Africa. Experienced in program management and developer relations with a focus on bridging the gender gap in technology.

Share This Article

XLinkedIn

Related Articles

Why Imported IoT Kits Fail in Kisumu: Power, Humidity, SIM, and Dust
Iot

Why Imported IoT Kits Fail in Kisumu: Power, Humidity, SIM, and Dust

A sensor kit that worked fine in a European or American test lab often fails within weeks near Lake Victoria. Here are the four environmental factors that catch imported IoT hardware off guard.

Khalid Hussein8 min read
Choosing a SIM and APN for Field Gateways in Western Kenya
Iot

Choosing a SIM and APN for Field Gateways in Western Kenya

Picking the wrong SIM type or APN configuration is one of the most common reasons a field IoT gateway never gets online at all. Here's what actually matters when choosing one for Western Kenya.

Tomlee Abila7 min read
Solar and Battery Sizing for a Lakeside Sensor Node
Iot

Solar and Battery Sizing for a Lakeside Sensor Node

Undersized solar and battery capacity is one of the most common reasons a field sensor node goes dark exactly when it's needed most, during extended cloud cover. Here's how to size it properly.

Khalid Hussein8 min read